Seeking Insight: Porsche Macan EV Delivery Timelines?

shawn

Macan 4
Well-Known Member
First Name
shawn
Joined
Jan 11, 2024
Threads
20
Messages
593
Reaction score
497
Location
Canada
Vehicles
Macan 4, Model Y, Model 3, XC 40 Recharge, Leaf
Country flag
Hi everyone,

I’m considering the new Porsche Macan EV and was looking into delivery times. For context, I’ve heard the wait for a Macan Turbo in France is about 10-12 months. Does anyone know if the Macan EV is facing similar timelines?

Appreciate any info you might have, especially if you’ve recently ordered or inquired about the Macan EV.

Thanks!
Just got my freeze date - July 1st with a production start of Aug 17th (7 weeks from freeze to production start). Production time is 5 days to build the car. So Aug 23rd my car will be ready to ship. As I am in Canada add at least 1 month to float over to Halifax then truck to the dealer is another few weeks (they est.). so I am looking at end of Sept....maybe if the boat does not sink. Now if your in the EU then I imagine no over seas shipping would get to you much sooner.
Sponsored

 

DuckMan

Macan 4
Well-Known Member
Joined
Jun 25, 2024
Threads
7
Messages
220
Reaction score
190
Location
NH
Vehicles
X5 40i, TRD Taco, K1200RS. past: M5, M3, 135i S2.
Country flag
If VAG sees another one of their boats sink, they may stop shipping cars altogether. That was crazy pricey!
Our dealer lost 4 custom builds in that I believe. Buyers just sitting in showroom models weeping after being told of the massive delays they would be seeing.
 
First Name
Ina
Joined
Feb 10, 2024
Threads
1
Messages
17
Reaction score
31
Location
Gumzof-macan24
Vehicles
Macan 4
Country flag
(Germany) Our Macan arrived at the dealer today and he informed us right away. It will still sit there until min. September 19th due to a software update. But of course we visited „our baby“ and took the chance to already sit in it and have a look. So sharing with you the unpacked Macan in frozenblue. Let’s see what you say.

Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? 8bc421dd-2a88-4c3c-aec7-a537b2bc5e9f


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? 4123e584-2fc0-4d87-bded-bddd72ebb512


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1554


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1549


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1544


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1555


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1546


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1543


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1545


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1557


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1550


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1551


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1548


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1547


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_1552
 
Last edited:

SupremeHustle

Macan 4S
Well-Known Member
Joined
Jan 24, 2024
Threads
2
Messages
61
Reaction score
70
Location
Minneapolis
Vehicles
2025 Aston Martin Vantage
Country flag
(Germany) Our Macan arrived at the dealer today and he informed us right away. It will still sit there until min. September 19th due to a software update. But of course we visited „our baby“ and took the chance to already sit in it and have a look. So sharing with you the unpacked Macan in frozenblue. Let’s see what you say.

8bc421dd-2a88-4c3c-aec7-a537b2bc5e9f.jpeg


4123e584-2fc0-4d87-bded-bddd72ebb512.jpeg


IMG_1554.png


IMG_1549.png


IMG_1544.png


IMG_1555.png


IMG_1546.png


IMG_1543.png


IMG_1545.png


IMG_1557.png


IMG_1550.png


IMG_1551.png


IMG_1548.png


IMG_1547.png


IMG_1552.png
Looks great, especially de-badged and without side markers. Wish we could get them in the US like that.
 


Diego

Macan 4
Well-Known Member
First Name
Diego
Joined
May 12, 2024
Threads
18
Messages
721
Reaction score
1,160
Location
Italy
Vehicles
Macan 4
Country flag
Thanks for posting, I hope to see mine in less than a month!
 
First Name
Ina
Joined
Feb 10, 2024
Threads
1
Messages
17
Reaction score
31
Location
Gumzof-macan24
Vehicles
Macan 4
Country flag
I translated our German config into English (ChatGPT did)


Here is the English translation of the Porsche configuration details based on the images you provided, with terms matching those typically found on the official Porsche configuration site:

### Image 1: Interior Design, Assistance Systems, and Other Features

- **Interior Design:**
- 6C4: Side Airbags in Rear Compartment
- VF1: Pedals and Footrest in Stainless Steel
- VT2: Door-Sill Guards in Brushed Aluminum, Illuminated, with "Porsche Exclusive Manufaktur" Logo

- **Assistance Systems:**
- PX6: Surround View with Active Parking Support
- GJ6: Porsche InnoDrive including Adaptive Cruise Control

- **Comfort & Everyday Usability:**
- KS5: Augmented Reality Head-Up Display
- VC2: HomeLink® (Garage Door Opener)
- QK3: Preparation for Porsche Dashcam, Porsche Exclusive Manufaktur
- 4E6: Comfort Access
- 3Y7: Electric Roll-up Sunblind for Rear Side Windows
- 3CX: Luggage Net

- **Infotainment:**
- JH2: Passenger Display

- **Charging & Range:**
- 9Z3: 230V Socket in Luggage Compartment

### Image 2: Individualization and Exterior Design

- **Exterior Colors:**
- D0: Frozen Blue Metallic

- **Lettering and Decals:**
- ONA: Deletion of Model Designation

- **Interior Colors & Materials:**
- PB: Leather Package in Black

- **Wheels:**
- 5BH: 22-inch RS Spyder Design Wheels, Painted in High-Gloss Black

- **Paint Variants:**
- 1NX: Wheels Painted in Black (Satin Finish), Porsche Exclusive Manufaktur

- **Seats:**
- Q2J: Adaptive Sport Seats in Front (18-Way, Electric) with Memory Package

- **Exterior Design:**
- 6FH: Exterior Mirrors Painted in High-Gloss Black, Porsche Exclusive Manufaktur
- QJ4: Side Window Trims in Black (High-Gloss), Porsche Exclusive Manufaktur

- **Sideblades:**
- 6H5: Sideblades Painted in Black (High-Gloss), Porsche Exclusive Manufaktur

- **Roof & Transport Systems:**
- 1M9: Towbar System with Manually Detachable Towball
- 3FU: Panoramic Roof System

- **Drive & Performance:**
- G1Z: 7-Speed Porsche Doppelkupplung (PDK)
- 1BK: Adaptive Air Suspension with Porsche Active Suspension Management (PASM)
- 8LH: Sport Chrono Package

- **Light & Visibility:**
- 1N3: Power Steering Plus
- 0N5: Rear-Axle Steering
- 8IU: LED Matrix Headlights
- 4L6: Automatically Dimming Interior and Exterior Mirrors
- 4GR: Heated Windscreen
- VW1: Privacy Glass

- **Interior Packages & Trims/Materials:**
- 5TE: Interior Package in Brushed Aluminum

- **Steering Wheel, Shift Lever:**
- 2FJ: GT Sport Steering Wheel in Leather, Including Steering Wheel Heating

Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_3358


Electric Macan EV Seeking Insight: Porsche Macan EV Delivery Timelines? IMG_3357
 
Last edited:


 







Top